Launch Homes

Guide

How long a custom build takes

How long does it take to build a custom home?

From the first conversation to the day you get your keys, most Launch homes take about 14 to 18 months. Here is how that time breaks down.

Design and budget: about 3 to 4 months

  1. A first call to talk about what you want to build, where and your budget.
  2. Example plans and real pricing from homes we have already built.
  3. Drafting with ScoHal Design Group, and interior design with VW Design in full 3D.
  4. A line by line budget, signed before we break ground.

Construction: about 10 to 14 months

The size of the home, the season you start in and the complexity of the finishes all affect the build time. Larger estate homes and acreage builds sit at the longer end.

Staying in the loop

Every Friday you get a full project update from your site manager: what was done, what is next, decisions we need from you and where the budget stands. At possession we walk the home with you, and we keep checking in after you move in.

Start Your BuildMore guides

Live Wow

Let's build your wow.

Tell us where you want to build and what you're dreaming of. We'll take it from there.

Start Your Build